This hot mop was done in a new construction shower pan. They stacked two 2x6's around the base of the pan for the 12 inches of blocking and four 2x4's for the dam for 6 inches in height. This shower is a little different than most in that the entrance is non symetrical slant; probably to make more room outside of the shower.

For more info on the benefits of hot mopped shower pans please visit our Home page or Contact Us.